MP/
THERMAL
A premium sauna-line concept designed around deliberate heat, repeatable recovery rituals and a physical environment that feels like part of the Momentum system—not a disconnected appliance.
PRODUCT DEVELOPMENT / NOT YET AVAILABLEEXPLORE THE CONCEPTMP/THERMAL
DESIGNED TO FEEL
LIKE A RECOVERY ROOM.
The public concept is being presented as an environment first: restrained, durable, intentional and unmistakably part of the Momentum Protocol physical system.
ONE PHYSICAL SYSTEM.
THREE DIFFERENT JOBS.
MP/THERMAL, MP/ZERO and Gear Systems are being developed as separate product families with distinct roles inside the same Momentum Protocol physical ecosystem.
A RECOVERY SPACE.
NOT JUST A SAUNA.
MP/THERMAL is being shaped around the ritual surrounding heat: entering, settling in, timing the session, cooling down and making recovery easier to repeat.
RITUAL
Make the recovery sequence feel intentional from the first minute to the last.
ENVIRONMENT
Use restrained lighting, dark materials and durable surfaces to create a focused setting.
CONNECTION
Let software support routine and history without making the physical product dependent on an app.
TWO WAYS INTO
THE HEAT.
The family is being explored as two experience tiers. These are positioning concepts—not final model names, dimensions or specifications.
COMPACT RECOVERY
A smaller-footprint direction for focused daily heat sessions and simpler placement.
STUDIO RECOVERY
A larger environment direction designed around a more immersive recovery-space experience.
COMPACT VS. STUDIO
This comparison describes the intended experience direction only. Final specifications remain open.
HEAT WITH
PURPOSE.
The goal is a clean, durable recovery environment where the ritual matters as much as the hardware.
RECOVERY FIRST
The product should make it easy to repeat a deliberate heat routine instead of adding friction to recovery.
PREMIUM, NOT FLASHY
Dark, calm, durable materials and restrained lighting should feel like Momentum Protocol in physical form.
CONNECTED WHEN USEFUL
Future app connectivity should support timing, routine and history without making the sauna dependent on software.
RECOVERY SHOULD
LIVE IN CONTEXT.
The long-term direction is for a heat session to fit naturally into the broader recovery routine without turning the sauna into a software-dependent appliance.
RECOVERY
Session timing, recovery routines and history could sit alongside the rest of the user's recovery context.
SEE THE MOMENTUM EXPERIENCE →PLANNER
A planned heat session could live beside training, sleep and daily schedule context when the user chooses.
SEE THE MOMENTUM EXPERIENCE →ASSISTANT
Momentum Assistant could help organize the routine and surface context without making recovery decisions for the user.
SEE THE MOMENTUM EXPERIENCE →PROTOCOLS
Heat exposure routines could be tracked as part of a broader personal protocol when appropriate.
SEE THE MOMENTUM EXPERIENCE →FUTURE DIRECTION: These connections describe product intent only. No hardware integration, automatic sync, or connected-device functionality is being promised at this stage.
WHAT IS LOCKED.
WHAT IS STILL OPEN.
This is a working development snapshot, not a launch announcement. It separates established product direction from the decisions that still require design, engineering, testing and vendor validation.
FOUNDATION IN PLACE
Brand directionUse-case hierarchyConcept familyRecovery positioningVALIDATION REQUIRED
Final industrial designDimensions + materialsElectrical + compliance pathVendor + manufacturingONE PLACE FOR REAL ASSETS.
As the product advances, approved evidence replaces these handoff states. The evidence registry remains the source of truth.
Approved architecture + render set
AWAITING EVIDENCEValidated technical package
AWAITING EVIDENCEReal unit + revision record
AWAITING EVIDENCESafety + performance evidence
AWAITING EVIDENCEQualified vendor + launch assets
AWAITING EVIDENCESTATUS: Concept development. No retail availability, final specification, certification, production commitment, price or launch date is being represented here.
THERMAL
CONCEPT / V0.1
FOUNDATION
Brand + experience direction
CURRENTINDUSTRIAL DESIGN
Translate concept to product
NEXTPROTOTYPE
Build physical unit
LOCKEDVALIDATE
Test safety + performance
LOCKEDLAUNCH READY
Approved production evidence
LOCKEDDOCUMENTED
Brand directionConcept familyExperience principlesEcosystem intentNOT YET PUBLISHED
Approved industrial designEngineering packagePrototype evidenceCompliance validationAdvance the public development state only when real evidence exists for the next gate. Concept copy can be replaced by approved renders, prototype photography, validated specifications and vendor-backed information without changing the page architecture.
CONCEPT → DESIGN → PROTOTYPE → VALIDATION → LAUNCH-READYPROGRESS NEEDS
PROOF.
This registry separates evidence already documented on the site from evidence that is only reserved or still required. A product gate does not advance until the supporting evidence exists.
BRAND + EXPERIENCE
Brand direction, use-case hierarchy and recovery experience principles
INDUSTRIAL DESIGN
Approved product architecture, render package, dimensions and material direction
ENGINEERING
Electrical, thermal, serviceability and component architecture documentation
PROTOTYPE
Real prototype photography, build record and revision history
VALIDATION
Safety, performance, durability and applicable compliance evidence
VENDOR
Qualified manufacturer, quality plan, packaging, logistics and support evidence
Only approved, supportable evidence should replace a placeholder. Concept renders remain labeled as concepts; prototype media should represent real physical units; technical claims should reflect validated specifications; vendor and compliance references should only appear after verification.
TRACK THE BUILD.
NOT JUST THE RESULT.
This public history records meaningful website and product-direction revisions. A revision entry does not imply a maturity-gate advance unless new real-world evidence supports it.
PRODUCT CONCEPTS ADDED TO SEARCHABLE ECOSYSTEM
MP/THERMAL, MP/ZERO, and Gear Systems are now discoverable through the unified public index while remaining explicitly Foundation / 01 and not for sale.
PUBLIC PROGRESS NOW READS PRODUCTION STATE
The Build Journal now combines editorial milestones with deployed release and release-gate telemetry while preserving product maturity boundaries.
PRODUCT MATURITY NOW TRACKED PUBLICLY
Added the Build Journal as the public source for verified progress while preserving Foundation / 01 until real product evidence exists.
JOURNEY OVERLAY + TRANSITION POLISH
Coordinated the compact journey rail with mobile overlays, orientation changes and immediate stage feedback while preserving accessible touch targets.
COMPACT JOURNEY TOUCH TARGETS HARDENED
Preserved the smaller iPhone journey rail while restoring accessible touch-target sizing and explicit stage labels.
IPHONE JOURNEY CHROME CORRECTED
Corrected the persistent mobile journey navigation and duplicate floating controls revealed by the post-V14.1 iPhone recording.
IPHONE + DESKTOP RENDERING REFINED
Adjusted mobile chrome, content clearance, secondary-text contrast, scroll rhythm and portfolio density based on real browser and iPhone recordings.
PUBLIC PRODUCT ARCHITECTURE FROZEN
The website framework for this product family is complete for this phase. Future maturity or content changes should be driven by real design, prototype, validation, vendor, or launch evidence.
CODE + MANUAL LAUNCH GATES SEPARATED
Final completion audit now distinguishes verified deployment checks from DNS, legal, real-device and deliverability checks that require human confirmation.
LIVE HEALTH CHECKS UNIFIED
Connected release fingerprinting with waitlist readiness and production-health diagnostics for final deployment validation.
LIVE BUILD DIAGNOSTICS HARDENED
Aligned product pages with the site-wide live deployment fingerprint and browser-side production verification flow.
RELEASE METADATA NORMALIZED
Aligned physical-product versioning with the wider site release state and final release-readiness metadata.
ANCHORS + STATUS LANGUAGE VERIFIED
Verified internal section targets and homepage ecosystem routes, aligned command-center deep links, and confirmed public status language remains consistent with Foundation-stage development.
FOCUS, MOTION + RENDERING POLISH
Improved keyboard focus, skip navigation, reduced-motion behavior, interaction consistency and off-screen rendering efficiency across the physical-product experience.
IPHONE + RESPONSIVE POLISH
Reduced mobile section density, strengthened touch targets and small-screen typography, removed avoidable overflow, and simplified status blocks for narrow screens.
PRODUCTION ARCHITECTURE LOCKED
Simplified navigation, removed duplicated asset placeholders, normalized the five-gate roadmap and established one production-handoff structure.
PUBLIC CHANGE LOG ESTABLISHED
Added a formal revision ledger so future product-direction changes, evidence additions and gate movement can be traced over time.
EVIDENCE REGISTRY ADDED
Separated documented, reserved and required product evidence so maturity progression is tied to proof.
SHARED FIVE-GATE ROADMAP
Synchronized Foundation, Design, Prototype, Validate and Launch Ready language across the physical-product portfolio.
COMMAND CENTER + PORTFOLIO HUB
Added product maturity, next-gate visibility and a portfolio-level development view.
PRODUCT FAMILY DEFINITION
Established product storytelling, concept families, comparisons, ecosystem intent, brand signatures and launch-readiness structure.
Future entries should state exactly what changed and whether evidence status or maturity changed. Visual polish, copy changes and placeholder updates remain revisions only; they do not count as product advancement.
FROM CONCEPT
TO VALIDATED PRODUCT.
The roadmap is intentionally staged. Final specifications, vendors, certifications, pricing and availability are not locked.
FOUNDATION
Brand, use case, experience principles and product-family direction.
DESIGN
Industrial design, materials, dimensions and engineering definition.
PROTOTYPE
Build real units and document revisions against the approved design.
VALIDATE
Verify safety, performance, durability and applicable compliance.
LAUNCH READY
Approve manufacturing, QC, packaging, logistics, support and final public specifications.
MP/THERMAL
IN THE SYSTEM.
This concept is one part of the larger Momentum Protocol ecosystem. Move to another physical system, return to the flagship vision, or see the verified public build record.